Attention New Jersey NADRA Members!

January 10. 2012 | Simpson Strong-Tie is holding a workshop in Cherry Hill, NJ on Thursday, January 19th.

What: Simpson Strong-Tie 2012 Deck and Porch Workshop
Registration: 8:30am

Online: www.strongtie.com/workshops
By Phone: Call 800.999.5099 and ask for ext 4016
By Fax: Fax the info found HERE to 614.876.1631

Workshop: 9:00am – 3:30pm Lunch Provided
About: (For a full description and registration form, click HERE.) The free workshop is designed for Architects, Engineers, Specifiers, Distributors, Sealers, Building Inspectors, Home Inspectors, Contractors & deck Builders. Meet with fellow NADRA members on Jan 19th in Cherry Hill for a chance to network with other industry professionals.

Links:
Registration Form
Itinerary

NADRA NJ Chapter – D4S Volunteers Needed!

August 1, 2011 | Hello everyone!

I hope you are all beating the heat and having a wonderful summer!

I know a bunch of us had an overwhelming response to helping out a soldier whom lost both legs to a roadside bomb in Afghanistan when we first heard about it at a previous NADRA meeting. Yes, I do know this is our busy time of the year and believe me, I could use an extra few hours, let alone a few days. However, I plan to help out no matter what. This soldier sacrificed his life for OUR freedom. One or two days out of my life fails to compare to what Lt. Colin Pascik (23 years old) gave up to keep America safe.

This time, the build will not be as labor intensive. Homes for our Troops has already poured the footings and framed the 11′ x 32′ deck (not to mention getting all of the inspections, etc). We just need to do the ramp, decking, and railings. Also, this time the ramp is much easier as it is a 30′ straight ramp. We are working on getting the rest of the the material donated. I believe Azek was already at this job site for the decking. We certainly have a lot of railing companies involved with NADRA also (I know Phoenix would love to donate railings and volunteers to install too), so railings will not be a problem. We just need some volunteers!!! Everything is ready to go. The home is in Monroe Township and the official ribbon cutting is in September, so we need to get this completed at the latest by mid August. I would like to schedule our part of the build to start Aug 8th if we can get all of our materials in time.

Here is a tentative list of what we need:
   • Volunteers!
   • Roughly 450 sq ft of decking
   • Fasteners for decking
   • Roughly 110 lf of railing
   • 80 lf of 1-1/2″ round handrail with hardware
   • Possibly some more footings
   • Concrete
   • Possibly some 4×4’s and other pt wood

Please respond to me and let me know if you are still interested in volunteering or donating. This WILL happen but I would love it if the NADRA NJ Chapter can get it done! Remember, this is the first year our chapter has not done a Deck for a Soldier!!!!

It has been one of the most fulfilling and inspirational programs that I have personally ever been involved with. I know those that have already been involved feel the same way. We hope to have some new volunteers this year. This really should be a very quick build. So we are only talking a few days for the build. Will you help? Please spread the word on this. Forward this e-mail to as many people as you can. I have a new hosting service and have not had the chance to update my e-mails to include all of my old NADRA contacts.

Sincerely,

Jennifer Sheridan
jennifer@phoenixpvcrails.com
Eatontown, NJ 07724
Cell: 732-567-5555
Ph: 732-380-1666

Driving Decking Demand in the R&R Market

Hot Topic Session #1 — Monday morning, October 3, 2011

August 1, 2011 | Number of Decks Built or Replaced in 2010 Drops 37% From 2006

The decking and railing industry is hurting. Homeowners are not currently building or replacing decks at levels seen in the mid 2000s. Principia’s most recent report shows the total number of decks built on residential homes decreased from 4.3 million in 2006 to 2.7 million in 2010, a 37% drop. As a consequence, the total demand for decking and railing materials has fallen similarly.

Such a drop in demand affects all companies in the value chain, including:
   • Builders and contractors
   • Dealers and retailers
   • Wholesale distributors
   • Manufacturers of decking, railing, fastener and accessories
   • Raw material suppliers

The decking and railing industry can sit back and wait for some type of economic recovery to occur or the industry can take an aggressive, proactive role in helping to create more decking demand.

How?

One proven way is through consumer awareness of deck safety and aggressive marketing to home owner associations. According to the North American Decking and Railing Association (NADRA), there are 40 million existing decks and the age of over half of these decks is 20 years or more. Many of these are unsafe and need to be replaced.

Continue reading “Driving Decking Demand in the R&R Market”

DeckTools® Offering Free Webinar on 5/7/10

Seeing is buying…

April 30, 2010 | Imagine showing a prospective customer a picture of their dream deck — and not just a drawing or sketch, but a realistic, full-color, 3D image they can look at from any angle. DeckTools®, a sales, design and estimating software program for decks, makes it easy for deck builders and suppliers to create one-of-kind deck designs right from their laptops.

Customize nearly every detail, from the deck shape and railings to materials, connectors and fasteners, while quickly generating plans, proposals and material lists. DeckTools® users are seeing 30% increases in their closing rates and 40% increases in the overall sale price of deck packages with DeckTools®.

Continue reading “DeckTools® Offering Free Webinar on 5/7/10”